General
Description: The well is located up-gradient of the Mud Creek Aquifer Recharge Site. |
Yearly Well Data
All Well Data
All Well Data Hydrograph (feet below ground surface - ft bgs)
Download All Data
Download All Data (.csv format)
Download Daily Average Data (.csv format)
Metadata for Data (.txt format)
*Data is updated every 3 months
Mud Creek Aquifer Recharge Information
Mud Creek Aquifer Recharge Site | |
Construction Year: 2015 Recharge Seasons: 2017 - Present |
|
Project Description | |
The Mud Creek Aquifer Recharge site was constructed in the fall of 2015. The site includes an enlarged basin within a grass pasture/wildlife area. Water for the project is delivered down the Fruitvale Ditch and then can overflow back into the Fruitvale Ditch. The site is up-gradient of the Mud Creek headwater springs and is expected to improve instream flows in Mud Creek and recover local groundwater levels. The site is expected to operate around 400-500 gpm (gallons per minute) or approximately 1 cfs (cubic feet per second). |
Documents | Document Name | Download Documents |
Project Designs | Click here to download | |
Project Photos | Click here to view photos | |
Grant Application | Click here to download | |
Grant Evaluation | Click here to download | |
Grant Agreement | Click here to download | |
Contacts & Partners | Name | Role | Organization |
John Royse | Site Construction | Royse Hydroseeding & Excavating | |
Steven Patten | Project Lead | Walla Walla Basin Watershed Council | |
Lance Horning | Project Engineer | Lance Horning Engineering |
Grants & Funding | Organization | Contract # | Funding Amount |
Oregon Watershed Enhancement Board (OWEB) | 214-6012-10490 | ||
Bonneville Power Administration |